Please use this identifier to cite or link to this item: http://148.72.244.84:8080/xmlui/handle/xmlui/13588
Title: تقييم الأداء الإنشائي لمشاريع محافظة ديالى باستخدام تقنية تقييم البدائل المتعددة المعايير النسبية المعقدة بعلاقات رمادية(COPRAS-G)
Other Titles: Structural Performance Evaluation of The Diyala City Projects Using the Method of Multiple Criteria Complex Proportional Assessment of Alternatives with Grey Relations (Copras-G)
Authors: Hafiz Ibrahem Naji
Keywords: الاداء الانشائي, طريقة تقييم البدائل المتعددة المعايير النسبية المعقدة بعلاقات رمادية.
Issue Date: 1-Mar-2014
Publisher: University of Diyala – College of Engineering
Citation: https://djes.info/index.php/djes/article/view/465
Abstract: ﯿﻌد اﻟﻘطﺎع اﻻﻨﺸﺎﺌﻲ اﻟﻤﺤرك اﻻﺴﺎﺴﻲ ﻟﻼﻗﺘﺼﺎد اﻟوطﻨﻲ ﻤن ﺠﻬﺔ وﻤن ﺠﻬﺔ ﺜﺎﻨﯿﺔ ﯿواﺠﻪ ﻫذا اﻟﻘطﺎع ﺘﻌﺜرا ﻓﻲ اداءﻩ وﯿﻤﺘﺎز ﺒﺎﻨدﻤﺎج ﻋدة ﻤﺸﺎﻛل ﻓﻲ ان واﺤد ﻨﺎﺘﺠﺔ ﻋن اﻟطﺒﯿﻌﺔ اﻟﻤﻌﻘدة وﻏﯿر اﻟﻤؤﻛدة ﻟﺒﯿﺌﺔ اﻟﻤﺸروع وﺘﻌدد اﻟﻌواﻤل اﻟﺘﻲ ﺘؤدي اﻟﻰ ﺤدوث ﺘﺎﺨﯿر زﻤﻨﻲ ﻓﻲ اﻟﺘﻨﻔﯿذ وارﺘﻔﺎع ﻓﻲ ﻛﻠﻔﺔ اﻟﻤﺸروع، وﻟﻤواﺠﻬﺔ ﻫذﻩ اﻟﺘﺤدﯿﺎت ﯿﺘطﻠب ﻤن ادارة اﻟﻤﺸروع ﻓﻲ ﻫذا اﻟﻤﺠﺎل طرق واﻤﻛﺎﻨﯿﺎت ذﻛﯿﺔ وﻤﻤﯿزة ﻓﻲ اﺘﺨﺎذ اﻟﻘرارات اﻟﺼﺤﯿﺤﺔ واﻟﺼﺎﺌﺒﺔ .وﯿﻌد اﺴﻠوب ﺘﻘﯿﯿم اﻟﺒداﺌل اﻟﻤﺘﻌددة اﻟﻤﻌﺎﯿﯿر اﻟﻨﺴﺒﯿﺔ اﻟﻤﻌﻘدة ﺒﻌﻼﻗﺎت رﻤﺎدﯿﺔ )COPRAS-G( اﺤد ﺘﻠك اﻷﺴﺎﻟﯿب. ﯿرﻛز ﻫذا اﻟﺒﺤث ﻋﻠﻰ ﺘﻘدﯿم )COPRAS-G( ﻛﺘﻘﻨﯿﺔ ﺘﺴﺎﻋد ﻋﻠﻰ اﺘﺨﺎذ اﻟﻘرار اﻻﻤﺜل ﻋﻨد اﻨﺸﺎء اﻟﻤﺸروع اﻟذي ﺘﻌﺘرﻀﻪ ﻤﺸﺎﻛل ﻤﻌﻘدة وﻤﺘﻌدد اﻟﻤﻌﺎﯿﯿر)MCDM(. وﺘطﺒق ﻫذﻩ اﻟﺘﻘﻨﯿﺔ ﻋﻠﻰ ﻤﺠﻤوﻋﺔ ﻤﺘﻨوﻋﺔ ﻤن اﻟﻤﺴﺎﺤﺎت ﻛوﻨﻬﺎ ﺘﺴﻤﺢ ﺒﺎﻟدراﺴﺔ اﻟﺸﺎﻤﻠﺔ وﻏﯿر اﻟﻤﺘﺤﯿزة ﻟﻠﻤﻌﺎﯿﯿر واﻟﺒداﺌل. ﯿﻬدف ﻫذا اﻟﺒﺤث اﻟﻰ اﺒراز اﻫﻤﯿﺔ اﻻداء اﻻﻨﺸﺎﺌﻲ، وﻛﯿف ﯿﻤﻛن ﺘوظﯿف اﺴس ﺘﻘﻨﯿﺔ )COPRAS-G( ﻓﻲ ﺘﻘﯿﯿم اﻻداء اﻻﻨﺸﺎﺌﻲ ﻟﻤﺸﺎرﯿﻊ ﻤﺤﺎﻓظﺔ دﯿﺎﻟﻰ ﻤن ﺨﻼل ﺘﺤدﯿد اﻟﻤﻌﺎﯿﯿر اﻟﻤﺴﺘﺨدﻤﺔ ﻟﺘﺤدﯿد اﻟﻤﺸروع اﻷﻤﺜل ﻤن ﻨﺎﺤﯿﺔ اﻻداء اﻻﻨﺸﺎﺌﻲ، وﻛذﻟك ﺘﺤدﯿد ﻗﺎﺌﻤﺔ ﺒﻤﺸﺎرﯿﻊ اﻟﻤﺤﺎﻓظﺔ اﻟرﺌﯿﺴﯿﺔ ﻟﻛﻲ ﻨﺨﺘﺎر اﻟﻤﺸروع اﻻﻤﺜل ﻤن ﻫذﻩ اﻟﻨﺎﺤﯿﺔ .وﻟﻐرض ﺘﺤﻘﯿق ﻫدف اﻟﺒﺤث، ﻓﻘد ﺘم ﺠﻤﻊ اﻟﺒﯿﺎﻨﺎت اﻟﺨﺎﺼﺔ ﺒﻪ ﻤن اﻻدﺒﯿﺎت اﻟﺘﻲ ﺘﻨﺎوﻟت ﻤوﻀوﻋﻲ ﺘﻘﯿﯿم اﻟﺒداﺌل اﻟﻤﺘﻌددة اﻟﻤﻌﺎﯿﯿر اﻟﻨﺴﺒﯿﺔ اﻟﻤﻌﻘدة ﺒﻌﻼﻗﺎت رﻤﺎدﯿﺔ واﻻداء اﻻﻨﺸﺎﺌﻲ، واﺨﯿرا ﻤن اﻟﻤﻘﺎﺒﻼت اﻟﺸﺨﺼﯿﺔ ﻤن ذوي اﻻﺨﺘﺼﺎص ﻤن اﻟﻤﺼﻤﻤﯿن واﻟﻤﻨﻔذﯿن ﻟﻬذﻩ اﻟﻤﺸﺎرﯿﻊ. اظﻬرت ﻨﺘﺎﺌﺞ ﺘﺤﻠﯿل اﻟﺒﯿﺎﻨﺎت ﻻﻓراد اﻟﻌﯿﻨﺔ ان ﻤﻌﺎﯿﯿر اﻟﻛﻠﻔﺔ، اﻟوﻗت، واﻟﻨوﻋﯿﺔ ﻫﻲ اﻛﺜر اﻟﻤﻌﺎﯿﯿر اﻫﻤﯿﺔ ﻻﺠراء اﻟﻤﻘﺎرﻨﺎت اﻟﺜﻨﺎﺌﯿﺔ ﺒﯿن ااﻟﻤﺸﺎرﯿﻊ، وان ﻤﻌﯿﺎر اﻟﻛﻠﻔﺔ ﻫو اﻛﺜر اﻫﻤﯿﺔ ﻤن ﺒﻘﯿﺔ اﻟﻤﻌﺎﯿﯿر ﻓﻲ اﻟﻤﺸﺎرﯿﻊ .واﺨﯿرا وﻤن ﺨﻼل ﺤﺴﺎب اﻻﻫﻤﯿﺔ اﻟﻨﺴﺒﯿﺔ ﻟﻠﻤﺸﺎرﯿﻊ واوﻟوﯿﺎت اﻟﺒداﺌل ودرﺠﺔ اﻟﻛﻔﺎءة ﻟﻬﺎ ﻨﺠد ان ﻤﺸروع ﻤﺤطﺔ ﻤﺠﺎري ﺒﻌﻘوﺒﺔ ﻗد ﺤﺼل ﻋﻠﻰ اﻟﻨﺼﯿب اﻻﻛﺒر ﻤن اﻷﻫﻤﯿﺔ و اﻟﻤﻨﻔﻌﺔ ﺒﺎﻟﻤﻘﺎرﻨﺔ ﻤﻊ اﻟﻤﺸﺎرﯿﻊ اﻻﺨرى. وﻓﻲ اﻟﻨﻬﺎﯿﺔ ﺘم اﻟﺘوﺼل اﻟﻰ ﻤﺠﻤوﻋﺔ ﻤن اﻻﺴﺘﻨﺘﺎﺠﺎت واﻟﺘوﺼﯿﺎت ﻟﻤﺨﺘﻠف ﺠواﻨب اﻟﻤوﻀوع ﻤن ﺒﯿﻨﻬﺎ، اﻹﺴراع ﻓﻲ ﺘطﺒﯿق ﺘﻘﻨﯿﺎت اﺘﺨﺎذ اﻟﻘرار اﻟﻤﺘﻌدد اﻟﻤﻌﺎﯿﯿر ﻓﻲ ﺘﻘﯿﯿم اﻟﻤﺸﺎرﯿﻊ إﻀﺎﻓﺔ اﻟﻰ اﻹﺴراع ﻓﻲ ﺘطﺒﯿق اﻟﻨظم اﻟﻤﻘﺘرﺤﺔ ﻟﻸداء اﻹﻨﺸﺎﺌﻲ ﻤن ﻗﺒل اﻟﺒﺎﺤﺜﯿن ﻟﻤﺴﺎﻋدة ﻤدراء اﻟﺸرﻛﺎت ﻋﻠﻰ ان اﺘﺨﺎذ اﻟﻘرار اﻟﻛﻔوء اﻟذي ﺴﯿؤدي اﻟﻰ ﻋﻤﻠﯿﺔ ﻀﺒط وﺴﯿطرة اكثر فعالية على المشروع الانشائي. The construction sector the main driver of the national economy on the other hand is facing this sector stumbled in his performance and the advantage of the merger of several problems at the same time due to the complex nature and uncertain environment of the project and the multiplicity of factors that lead to the occurrence of a time delay in implementation and high cost of the project, and to address this challenges requires the project management methods in this area and the potential of a smart and distinctive in making the right decisions. The method of multiple criteria complex proportional assessment of alternatives with Grey relations (COPRAS-G) is one of those methods. This research focuses on providing (COPRAS-G) technique helps to make the best decisions when setting up the project, which encountered problems are complex and multi-criteria (MCDM). And apply this technique on a variety of areas as it allows the comprehensive study and non-biased criteria and alternatives. This research aims to highlight the importance of structural performance, and how it can be employed technical grounds (COPRAS-G) in assessing the structural performance of the Diyala City projects, through the identification of the criteria used to select the best project in terms of structural performance, and also to identify a list of projects the main province in order to choose the project optimization of this area. For the purpose of achieving the objective of research, has been collecting its own data from the literature that dealt with a multiple criteria complex proportional assessment of alternatives with Grey relations and, structural performance, and finally personal interviews of qualified designers and implementers of these projects. The results of data analysis for the sample showed that standards of cost, time, and quality is the most important criteria for bilateral comparisons between projects, and that the standard cost is more important than the rest of the criteria in the projects. Finally, and by calculating the relative importance of the projects and priorities of the alternatives and the utility degree have, we find that plant project streams Baquba has received the largest share of the benefit and importance compared with other projects. In the end, was a set of conclusions and recommendations of the various aspects of the topic from, accelerate the application of techniques of decision-making multi-criteria in the evaluation of projects in addition to expediting the application of the proposed systems for Structural Performance by researchers to help corporate managers that the decision-making efficient, which will lead to a process control and more effective control on the construction project.
URI: http://148.72.244.84:8080/xmlui/handle/xmlui/13588
ISSN: 1999-8716
Appears in Collections:مجلة ديالى للعلوم الهندسية / Diyala Journal of Engineering Sciences (DJES)

Files in This Item:
File Description SizeFormat 
البحث الاول حافظ ابراهيم ناجي.pdf1.34 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.