Please use this identifier to cite or link to this item: http://148.72.244.84:8080/xmlui/handle/xmlui/7164
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMohammed Hadi-
dc.contributor.authorAbbas M. Abd-
dc.date.accessioned2023-10-24T16:08:15Z-
dc.date.available2023-10-24T16:08:15Z-
dc.date.issued2021-
dc.identifier.issn1999-8716-
dc.identifier.urihttps://djes.info/index.php/djes-
dc.identifier.urihttp://148.72.244.84:8080/xmlui/handle/xmlui/7164-
dc.description.abstractConstruction project delay is a global phenomenon. The delay risk being regarded as a main challenge that is tackled via the firms of construction. It possessed an inverse effect upon the performance of the project resulting in cost overruns and productivity reduction. In Iraq, most construction projects surpassed their prearranged time and were delayed, resulting in a loss of productivity and income. The objective of this paper was to predict the cost and delay of construction projects to illustrate their risks effects by using of artificial neural networks with the particle swarm optimization method (ANN-PSO). Thereby, risk factors were identified and analysed using Probability and Impact Analysis which were embraced as the model inputs. In comparison, the outputs for the models were represented by the ratio of the contractor's profit to project costs and the delay in construction projects. An ANN model was additionally evolved with a backpropagation (BP) optimization method to assess the exhibition of the ANN-PSO model. To evaluate the accuracy of the results of the ANN-PSO model, coefficient of correlation (R), determination coefficient (R2), and root mean squared error (RMSE) was utilized as performance evaluation of the models. The ANN-PSO model showed a significant performance in the delay prediction. The performance evaluation for the cost and delay prediction were (R=0.929, R2=0.863, RMSE=0.044), and (R=0.998, R2=0.996, RMSE=0.094), respectively. The model of ANN-PSO has a virtuous performance in the delay prediction better than the cost. However, the ANN-BP model showed better performance than ANN-PSO in term of cost prediction.en_US
dc.language.isoenen_US
dc.publisherUniversity of Diyala – College of Engineeringen_US
dc.subjectArtificial Neural Networks (ANN)en_US
dc.subjectParticle Swarm Optimization (PSO)en_US
dc.subjectPrediction Of Costen_US
dc.subjectPrediction Of Delayen_US
dc.titleUsing of an Artificial Neural Networks with Particle Swarm Optimization (ANN-PSO) Model in Prediction of Cost and Delay in Construction Projectsen_US
dc.typeArticleen_US
Appears in Collections:مجلة ديالى للعلوم الهندسية / Diyala Journal of Engineering Sciences (DJES)

Files in This Item:
File Description SizeFormat 
7-840.pdf850.34 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.