Abstract:
ABSTRACT
Risks and its management are important for the success of the project, as the
risks in construction projects must be minimized to achieve the goals of the project
which are time ,cost and quality .The risk management compose of planning,
identification, analysis, and response which has an important phase, namely risk
response that it should not be undermined, as its success gain the projects the
capability to overcome the uncertainty and thus an effective tool in project risk
management.
The aim of the research is managing the cost risks generated from risk response to
control the cost risks in the projects through the adoption of the fuzzy decision tree,
system dynamic, highlight the role of risk response in the construction projects, its
effect on the cost and the selection of the optimal risky response through Particle swarm
and Gravitational Search Algorithm.
To achieve the aim of the research, a review of the scientific literature and sources
which deal with risk management, risk responses concept and strategies in construction
projects, the costs elements, types, and factors affecting it with investigating the causes
of their appearance.
The results of data analysis of samples for the three periods 2006-2007,2008-2009,
and2014-2016 have shown that different reason that leads to risk response failure, but
the following found in every period, the inability to introduce sophisticated
management methods to respond to risk, inadequate strategy with high-risk, failure to
complete the risk response plan in a timely manner, neglecting the role of supervisors in
the process of monitoring the risk response plan.
VII
While the analysis of cost risk generated from risk response for every period the
following found in every period, delay in completing the project, ability to construct,
wrong estimation.
In the light of what has been reached by the data analysis of samples in the construction
project, a management system has been built which can be used for the qualitative and
quantitative analysis of risk by using fuzzy decision tree and system dynamic
respectively, and then by analysis these risks, a risk response is being selected by using
Particle swarm and the Gravitational Search Algorithm.
The result of the risk response selection shows that the investment (contractor, bank)
strategy shows a very good strategy as it saves the cost about 30%, while the Mitigate
(pay for advances with interest 0. 1) strategy show saving the cost 40% and giving
land to contractors show saving in cost about 40% finally the BIM strategy show saving
in cost about 25%.
The results of the assessment questioner approach for the management systems and
computer programs, that this system facilitates the analyses of the cost risks and raise
the efficiency of decision makers in the risk response selection and reducing the cost of
the project by using the optimal strategy. Finally, serval suggestions have been reached
for a set of for further research.