Please use this identifier to cite or link to this item: http://148.72.244.84:8080/xmlui/handle/xmlui/2902
Title: Effect Of Building Information Modeling on The Building Design in Oil Project Sector
Authors: ايفان عماد
Issue Date: 2021
Publisher: جامعة ديالى
Abstract: ((Abstract)) The sector of oil is important for the country economic, community, and ecological agendas and therefore take an important role in the Iraq future, the managers who have the responsibility for activities planning and coordinating and for the same time obtaining the best cost, time, quality and human resources so that objectives of the project are finally obtained . Hence, any conflict in these projects lead to significant conflict and subsequent problems and especially in the design phase. The research's key goal is to create a method to control the design process in the oil projects industry and reduce the design conflict using building information modeling. To attain the goal ,a review of the previous studies that manage the BIM and its use in oil sectors and methods in building projects Studying issues of cost and duration, types, and influences that may affect the projects Reviewing the artificial intelligence techniques and the stages of its processes and its usages in the building projects. Make a Field Study with open and closed surveys, build a system with particle swarm optimization , and finally build a case study with building information modeling (BIM). The results showed that the design stage show the highest phase that cause problems in the projects. Using BIM will improve design quality (reducing conflicts / reducing redesign, managing changes in design. The highest reason is that the multiplicity of owners in the owner's organization , which mean the decision is been making by different person that represent the owner side which lead to conflict and change in the design. highest , as the most of the design changes are due to the conflict or miss in design by the designer and the unused of modern techniques. vi Support vector machine (SVM) show higher performance with 70% in prediction of design change on oil projects. Most of the design conflicts were missing in elements which require to return the drawing and rework. As using BIM introduce many benefit regard quantity calculation as lead to reduce the cost about 30% , visual inspection , reporting and information availability. Finally , set of conclusion and recommendations were extracted from this research
URI: http://148.72.244.84:8080/xmlui/handle/xmlui/2902
Appears in Collections:ماجستير

Files in This Item:
File Description SizeFormat 
97.pdf2.02 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.