Please use this identifier to cite or link to this item: http://148.72.244.84:8080/xmlui/handle/xmlui/3297
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLayth A. Hasnawi-
dc.date.accessioned2023-10-14T18:33:52Z-
dc.date.available2023-10-14T18:33:52Z-
dc.date.issued2016-
dc.identifier.citationhttps://djes.info/index.php/djesen_US
dc.identifier.issn1999-8716-
dc.identifier.urihttp://148.72.244.84:8080/xmlui/handle/xmlui/3297-
dc.description.abstractThe present work has concerned with partial programmed maintenance that should be done on machines in order to increase production and improving quality in one of the biggest companies in Iraq. Data was collected by vesting one of the factories to five different machines for six months as to the number of stoppages in machine, the best period for testing, stoppage reasons, repair period and the number of stoppages. The possibility of monthly stoppage was calculated, and damage period, and the expected number for each machine stoppage. A computer program to calculate the best period for partial maintenance by using (Microsoft office Access 2007 program), In order to confirm the effective operation of the program was applied on ten default machines (A, b, C, D, E, F, G, H, I, J) for six months watching period as shown in table number (1).en_US
dc.language.isoenen_US
dc.publisherUniversity of Diyala – College of Engineeringen_US
dc.subjectProgrammed Partial Maintenanceen_US
dc.subjectProductivityen_US
dc.subjectPower Factoryen_US
dc.subjectDiyala Companyen_US
dc.titleStudy the effect of Programmed Partial Mainteanence on the Power factory Productivty in diyala company for electrical INDUSTRIESen_US
dc.typeArticleen_US
Appears in Collections:مجلة ديالى للعلوم الهندسية / Diyala Journal of Engineering Sciences (DJES)

Files in This Item:
File Description SizeFormat 
LAYTH 10.pdf668.53 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.