Please use this identifier to cite or link to this item: http://148.72.244.84:8080/xmlui/handle/xmlui/3297
Title: Study the effect of Programmed Partial Mainteanence on the Power factory Productivty in diyala company for electrical INDUSTRIES
Authors: Layth A. Hasnawi
Keywords: Programmed Partial Maintenance
Productivity
Power Factory
Diyala Company
Issue Date: 2016
Publisher: University of Diyala – College of Engineering
Citation: https://djes.info/index.php/djes
Abstract: The present work has concerned with partial programmed maintenance that should be done on machines in order to increase production and improving quality in one of the biggest companies in Iraq. Data was collected by vesting one of the factories to five different machines for six months as to the number of stoppages in machine, the best period for testing, stoppage reasons, repair period and the number of stoppages. The possibility of monthly stoppage was calculated, and damage period, and the expected number for each machine stoppage. A computer program to calculate the best period for partial maintenance by using (Microsoft office Access 2007 program), In order to confirm the effective operation of the program was applied on ten default machines (A, b, C, D, E, F, G, H, I, J) for six months watching period as shown in table number (1).
URI: http://148.72.244.84:8080/xmlui/handle/xmlui/3297
ISSN: 1999-8716
Appears in Collections:مجلة ديالى للعلوم الهندسية / Diyala Journal of Engineering Sciences (DJES)

Files in This Item:
File Description SizeFormat 
LAYTH 10.pdf668.53 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.